Permit toWork Induction >>> Watch the video >>> "*" indicates required fields First Name*Last Name*Email* I, the individual, confirm I have read the presentation I understand and accept that my personal information is used exclusively for the purpose of recording completed inductions I understand and accept that each party shall comply with their respective obligations under the Privacy Act 2020. Neither Auckland Transport Limited, Auckland One Rail Limited, nor anyone acting on their behalf, intend to have access to personally identifiable information for commercial purposes, of those individuals engaged in providing services that are required to register by using this form for any reason. Such personally identifiable information will be used exclusively in relation to completion of the induction. Disclaimer* I acknowledge the above terms 1. Contractors working on the network and depots will be subject to which of the following?* Compliance audits from AOR Asset, Management and Engineering Safety Audits from AOR Health and Safety Random Drug and Alcohol Testing All the above None of the above 2. When activating your PTW, what do you need to provide with SCC/Depot OPs when you call them?* PTW number & details of the activity for the day Expected duration of the activity Name of the workers involved All of the above 3. Who is responsible for identifying a Safe Place when working on the rail corridor?* AOR Stations Manager Contractor Site Supervisor / In charge RPO, and/or site protector if appointed All the above None of the above 4. A contractor’s PTW will be suspended if there is a breach in the conditions of their Permit.* True False 5. What are the potential risks for people or members of the public in the rail network?* People who engage in a physical attack People might be intoxicated and not in their proper mind Self-harmer individuals Workers who act unsafely on the network All the above None of the above 6. What are the important requirements to consider when working on Station Platforms?* No work beyond the yellow platform edge tactiles during service hours Emergency public access/egress should not be restricted and hindered during service hours Contractor’s work activity noise should minimize impact on station public address Pedestrian flow management plan will be required if works impact platform areas and designated walkways All of the above None of the above 7. Before doing any Critical work (Hot Work, Working at Heights, Isolation, Confined Space Entry, etc.) what is the first thing you need to do?* Prepare the area and make sure that the surroundings are safe to do the work Coordinate with the Station Manager and have the Critical works permit signed Nothing, you can start the work immediately Have a snack first to make sure that you have the energy to do the work Workers are only allowed to use 8. Who will be doing the isolation of equipment or isolation of service supply if needed?* KiwiRail Local electrician Authorised AOR contractor for isolation Mates who know the equipment 9. What is the distance, in meters, that is considered safe in relation to the MAD zone?* 2meters for persons and tools .75meters for emergency rescue 8meters for scaffolding 4meters for plant All the above A & B only 10. What do you need to do in case of an Emergency?* Stop Work, inform the supervisor and the SCC/Wiri Ops, follow the evacuation or rescue procedures, and call 111 if needed. Check the area and if does not affect your work, continue with the activity Call 111 immediately Take a video of the event and post it on social media This field is hidden when viewing the formNumberEmailThis field is for validation purposes and should be left unchanged.